Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 16, 2018, 06:45 AM
  • 15 0429_15 0428 _16052018_000532.mp4

Date
05/15/2018
W/O
695648
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00607
PipeID
P12356
Time
11:45 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5593
Sewer Name
15 HILL DRIVE EXTENSION TRUNK
City
SOUTH SAN GABRIEL
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
26
Purpose
Routine Assessment
Project
WO_695648_TV15034_APR2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
15 0429
Downstream MH
15 0428
Dir. of Survey
Downstream
Length Surveyed
374 ft.
Total Length
374 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
150
Pipe schematic from manhole 15 0429 to 15 0428
MH: 15 0429MH: 15 0428downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 04292 ft. MLC - Lining Change, Cured in place3.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start38 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"43.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"70.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"91.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"145.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"172.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"193.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"217.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"232 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"268.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"301.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"334.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"336.9 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: NO, 4" - ROOTS372.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish374 ft. AMH - Downstream Manhole, Survey Ends - 15 0428

Observation photos (2)

  • Lining Change, Cured in place

    2 ft. - Lining Change, Cured in place

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2MLC
217.9TFC
145.5TFA
172.6TFC
91.3TFA
3.7DAGS
38TFA
0MWM
301.4TFA
0MWL
268.2TFC
193.7TFA
70.3TFA
0AMH15 0429
372.5DAGS
232TFA
334.3TFC
336.9TFDROOTS
43.7TFA
374AMH15 0428

Properties (7)

additional_info
SC359359
custom_field_two
4
customer
LACSD
datetime
2018-05-15T23:45:05-07:00
is_lateral_inspection
false
lining
PVCP-Folded/Reformed
year_laid
33882