Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 10, 2018, 11:12 AM
  • 08 0095_08 0094 _10042018_042245.mp4

Date
04/10/2018
W/O
694025
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00016
PipeID
P00129
Time
4:12 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5526
Sewer Name
08 MAIN STREET TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
01
Purpose
Routine Assessment
Project
WO_694025_TV08116_APR2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
08 0095
Downstream MH
08 0094
Dir. of Survey
Downstream
Length Surveyed
322.6 ft.
Total Length
322.6 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4111
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 08 0095 to 08 0094
MH: 08 0095MH: 08 0094downstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 08 00950 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH3.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start62.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"163.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"234.4 ft. RFJ - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YESR260.9 ft. TSC - Tap Saddle Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"318.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.6 ft. AMH - Downstream Manhole, Survey Ends - 08 0094322.6 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
163.9TFC
0AMH08 0095
0MWL
3.8CM
322.6AMH08 0094
322.6MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
0MWM
234.4RFJ
260.9TSC
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
318.2CM
62.6TF

Properties (6)

additional_info
SC358733
custom_field_two
3
customer
LACSD
datetime
2018-04-10T04:12:30-07:00
documentation
PROPIPE
is_lateral_inspection
false