05 1009_05 1044_6302017_111804.mp4
8.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8.9 ft. - General Observation - POSSIBLE MAGNESIUM HYDROXIDE COAT, FROM 8 TO 4 OCLOCK, 25%
306.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES
314.8 ft. - General Photograph - SURFACE SPALLING, FROM 8 TO 4 OCLOCK
325.6 ft. - General Observation - POSSIBLE STOP LOG AT MH (NOT IN PLACE), 12 OCLOCK
325.6 ft. - General Observation - CAPPED/BULKHEAD CONNECTION AT 12 OCLOCK, AT MH
326.5 ft. - Downstream Manhole, Survey Ends - 11:40 PM
| Distance | Code | Observation |
|---|---|---|
| 8.9 | MGO | POSSIBLE MAGNESIUM HYDROXIDE COAT, FROM 8 TO 4 OCLOCK, 25% |
| 8.4 | SSS | — |
| 314.8 | MGP | SURFACE SPALLING, FROM 8 TO 4 OCLOCK |
| 306.6 | SAP | — |
| 0 | MWM | — |
| 0 | AMH | 11:17 AM |
| 324.3 | SSS | — |
| 326.5 | AMH | 11:40 PM |
| 0 | MWL | — |
| 325.6 | MGO | POSSIBLE STOP LOG AT MH (NOT IN PLACE), 12 OCLOCK |
| 324.3 | SAV | — |
| 325.6 | MGO | CAPPED/BULKHEAD CONNECTION AT 12 OCLOCK, AT MH |
| 8.6 | SAV | — |