Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2019, 10:02 AM
  • H 0219_A 1223_13052019_030338.mp4

Date
05/13/2019
W/O
761427
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00171
PipeID
P10636
Time
3:02 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6545
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_761427_TV02361_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 0219
Downstream MH
A 1223
Dir. of Survey
Downstream
Length Surveyed
290.8 ft.
Total Length
290.8 ft.
Structural Index
2
Structural Quick
322K
Structural Rating
122
O&M Index
3
O&M Quick
3G2B
O&M Rating
148
Overall Index
2
Overall Quick
Overall Rating
270
Pipe schematic from manhole H 0219 to A 1223
MH: H 0219MH: A 1223downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - H 02191 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start20.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start42.1 ft. MGO - General Observation - line right 20 degrees93 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish93 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start93 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"103.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish103.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start290.7 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish290.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290.8 ft. AMH - Downstream Manhole, Survey Ends - A 1223290.8 ft. MGO - General Observation - connection at 9'0 at MH

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    20.7 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    103.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
1SSS
93DAGS
0MWL
290.8SAP
103.7SAV
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK
20.7DAGS
103.7SAP
290.8AMHA 1223
290.8MGOconnection at 9'0 at MH
93DAGS
93TFA
42.1MGOline right 20 degrees
290.7DAGS
290.7SSS
0AMHH 0219
6.5SAV

Properties (4)

custom_field_two
3
customer
LACSD
datetime
2019-05-13T03:02:38-07:00
is_lateral_inspection
false