C 0386_C 0385_05082019_024840.mp4
6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8 ft. - Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES
18.5 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES
27.8 ft. - Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES
67.2 ft. - Infiltration Dripper, from 10 to 02 o'clock, within 8 inches of joint: YES
92.9 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
95 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES
155.8 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES
188.9 ft. - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: YES, 8", 3"
399.5 ft. - Infiltration Gusher, from 08 to 11 o'clock, within 8 inches of joint: YES
408.6 ft. - Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 1 | SSS | — |
| 411.3 | SRV | — |
| 6 | SAP | — |
| 8 | ID | — |
| 18.5 | IG | — |
| 0 | MWM | — |
| 155.8 | IG | — |
| 1 | DAGS | — |
| 192.9 | SAP | — |
| 95 | SRV | — |
| 0 | MWL | — |
| 67.2 | ID | — |
| 68.5 | TFA | — |
| 412 | DAGS | — |
| 408.6 | IR | — |
| 90.9 | TFA | — |
| 92.9 | SRV | — |
| 399.5 | IG | — |
| 0 | AMH | C 0386 |
| 335.8 | IR | — |
| 27.8 | ID | — |
| 413.4 | AMH | C 0385 |
| 413.4 | MGO | CONNECTION IN MH 9 OCLOCK |
| 413 | SSS | — |
| 188.9 | TBI | — |