Wastewater/Activity/PacpInspection/1.0Nov 28, 2017, 09:38 AM
  • 22 0275_22 0274_28112017_015442.mp4

Date
11/28/2017
W/O
674585
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00793
PipeID
P16561
Time
1:38 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5144
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_674585_TV22015_DEC2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0275
Downstream MH
22 0274
Dir. of Survey
Downstream
Length Surveyed
194.3 ft.
Total Length
194.3 ft.
Structural Index
4
Structural Quick
5232
Structural Rating
16
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
16
Pipe schematic from manhole 22 0275 to 22 0274
MH: 22 0275MH: 22 0274downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02757.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.1 ft. MGO - General Observation - MAGNESIUM COATING START66 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"82.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish82.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES86.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start130.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start148.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"162.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish190.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish194.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0274194.3 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

    82.7 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    86.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    130.6 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MWL
148.2TFC
7.1SAP
86.6SAP
194.3AMH22 0274
82.7SAP
190.7SAP
0MWM
82.7SRV
130.6SRV
66TFC
7.1MGOMAGNESIUM COATING START
0AMH22 0275
162.7SRV
194.3MGOLATERAL AT MH 9 OCLOCK

Properties (6)

additional_info
SC346454
custom_field_two
2
customer
LACSD
datetime
2017-11-28T01:38:47-08:00
documentation
PROPIPE
is_lateral_inspection