Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 21, 2017, 09:08 AM
  • 22 1082_22 1081 _21072017_023428.mp4

Date
07/21/2017
W/O
646476
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00812
PipeID
P17455
Time
2:08 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4665
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
18
Purpose
Routine Assessment
Project
WO_646476_TV22042_JUL2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1081
Downstream MH
22 1082
Dir. of Survey
Upstream
Length Surveyed
312.7 ft.
Total Length
312.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 1081 to 22 1082
MH: 22 1081MH: 22 1082upstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 22 108218.9 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"36.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"79.1 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 4"95.6 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"117.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"167.4 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"181.8 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 4"185.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"233.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"255.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"303.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start309.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start312.7 ft. MWL - Water Level, 15 %of cross sectional area312.7 ft. MWM - Water Mark, 30 %of cross sectional area312.7 ft. AMH - Downstream Manhole, Survey Begins - 22 1081

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
293.8TF
0MWL
312.7DAGS
78.9TFC
233.6TB
0MWM
217.1TFC
275.8TFC
57.2TFC
195.1TFC
312.7CM
0AMH22 1081
127.3TFC
9.2CM
3.2DAGS
145.3TFC
130.9TB
312.7AMH22 1082

Properties (6)

additional_info
SC345603
custom_field_two
3
customer
LACSD
datetime
2017-07-21T02:08:06-07:00
documentation
PROPIPE
is_lateral_inspection
false