Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 17, 2017, 10:08 AM
  • 18 0884_18 1184 _20170517_033401.mp4

Date
05/17/2017
W/O
635479
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00709
PipeID
P14735
Time
3:08 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4498
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
WO_635479_TV18051_MAY2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
18 0884
Downstream MH
18 1184
Dir. of Survey
Downstream
Length Surveyed
424 ft.
Total Length
424 ft.
Structural Index
4
Structural Quick
5K3K
Structural Rating
496
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
496
Pipe schematic from manhole 18 0884 to 18 1184
MH: 18 0884MH: 18 1184downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 08840 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area5.8 ft. SAP - Surface Aggregate Projecting, from 03 to 05 o'clock, within 8 inches of joint: YES, Start5.8 ft. SRV - Surface Reinforcement Visible, from 07 to 09 o'clock, within 8 inches of joint: YES, Start5.8 ft. SRV - Surface Reinforcement Visible, from 03 to 05 o'clock, within 8 inches of joint: YES, Start5.8 ft. SAP - Surface Aggregate Projecting, from 07 to 09 o'clock, within 8 inches of joint: YES, Start160.1 ft. SRV - Surface Reinforcement Visible, from 07 to 09 o'clock, within 8 inches of joint: YES, Finish160.1 ft. SAP - Surface Aggregate Projecting, from 03 to 05 o'clock, within 8 inches of joint: YES, Finish160.1 ft. SRV - Surface Reinforcement Visible, from 03 to 05 o'clock, within 8 inches of joint: YES, Finish160.1 ft. SAP - Surface Aggregate Projecting, from 07 to 09 o'clock, within 8 inches of joint: YES, Finish424 ft. AMH - Downstream Manhole, Survey Ends - 18 1184 ZOOMED IN

Observation photos (4)

  • Surface Aggregate Projecting, from 03 to 05 o'clock, within 8 inches of joint: YES, Start

    5.8 ft. - Surface Aggregate Projecting, from 03 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 07 to 09 o'clock, within 8 inches of joint: YES, Start

    5.8 ft. - Surface Reinforcement Visible, from 07 to 09 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 03 to 05 o'clock, within 8 inches of joint: YES, Start

    5.8 ft. - Surface Reinforcement Visible, from 03 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 07 to 09 o'clock, within 8 inches of joint: YES, Start

    5.8 ft. - Surface Aggregate Projecting, from 07 to 09 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
160.1SRV
5.8SAP
0AMH18 0884
160.1SAP
0MGOCONNECTION AT MH 9 O'CLOCK
5.8SRV
0MWM
5.8SRV
0MWL
160.1SRV
424AMH18 1184 ZOOMED IN
160.1SAP
5.8SAP

Properties (5)

additional_info
SC345307
custom_field_two
2
customer
LACSD
datetime
2017-05-17T03:08:51-07:00
is_lateral_inspection
false