Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2019, 11:06 AM
  • B 1352_B 1351_6112019_045833.mp4

Date
06/11/2019
W/O
0771792
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01126
PipeID
P25064
Time
4:06 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1229
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
08
Purpose
Routine Assessment
Project
20190610MDM_JOINT_OUTFALL_B_UNIT_6J
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
B 1352
Downstream MH
B 1351
Dir. of Survey
Downstream
Length Surveyed
240.7 ft.
Total Length
240.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole B 1352 to B 1351
MH: B 1352MH: B 1351downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:55AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active5.8 ft. MGO - General Observation - 12" VCP + CIPP81.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open229.8 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Open231.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open240.7 ft. AMH - Downstream Manhole, Survey Ends - 5:20AM

Observation photos (2)

  • General Observation - 12" VCP + CIPP

    5.8 ft. - General Observation - 12" VCP + CIPP

  • Downstream Manhole, Survey Ends - 5:20AM

    240.7 ft. - Downstream Manhole, Survey Ends - 5:20AM

Observations (9)

DistanceCodeObservation
81.8TBOpen
5.8MGO12" VCP + CIPP
229.8TBOpen
0AMH4:55AM
0MWM
0MWL
231.2TBOpen
0MGOConn. @ Mh, 3 O' Clock. Active
240.7AMH5:20AM

Properties (7)

custom_field_three
CIPP LINER GOOD COND
custom_field_two
4
customer
LACSD
datetime
2019-06-11T04:06:44-07:00
documentation
MARTIN,REVELES,OLIVER 111,SHADLER
is_lateral_inspection
false
lining
CIPP