H 0402_H 0401A_9202018_114527.mp4
0 ft. - Upstream Manhole, Survey Begins - 11:44 AM
0.1 ft. - Water Mark, 35 %of cross sectional area
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.3 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG
8.1 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start
8.1 ft. - General Photograph
11.7 ft. - General Photograph
20.5 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 20.5 | SZ | 30% MAG |
| 20.5 | SAV | — |
| 20.5 | DAR | — |
| 20.5 | SSS | — |
| 2 | SAP | — |
| 20.5 | SAP | — |
| 21 | MGO | Peeling & Flaking Throughout The Reach |
| 8.1 | DAR | — |
| 11.7 | MGP | — |
| 0.1 | MWL | — |
| 2.1 | SRV | — |
| 22 | AMH | 12:00 PM |
| 2 | SAV | — |
| 0.1 | MWM | — |
| 20.5 | SRC | — |
| 2 | SSS | — |
| 21 | MGP | GREASE THROUGHOUT THE REACH (5%) |
| 2 | SRC | — |
| 2.3 | SZ | 30% MAG |
| 20.5 | SRV | — |
| 8.1 | MGP | — |
| 0 | AMH | 11:44 AM |