Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 2, 2018, 07:50 AM
  • C 0119B_C 0119A_522018_014531.mp4

Date
05/02/2018
W/O
0703730
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00127
PipeID
P20079
Time
12:50 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0850
Sewer Name
C JOINT OUTFALL C - UNIT 4B
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
20
Purpose
Routine Assessment
Project
20180502MDM_JOINT_OUTFALL_C_UNIT_4B
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
C 0119A
Downstream MH
C 0119B
Dir. of Survey
Upstream
Length Surveyed
72.4 ft.
Total Length
72.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole C 0119A to C 0119B
MH: C 0119AMH: C 0119Bupstream0 ft. AMH - Downstream Manhole, Survey Ends - 1:40AM0.4 ft. MGO - General Observation - STOPLOG IN PLACE0.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE35.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE35.2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE46.4 ft. MGO - General Observation - 48" RCP-FRPP64.4 ft. MGO - General Observation - 48" RCP-FRPP72.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE72.4 ft. AMH - Downstream Manhole, Survey Begins - 12:55AM72.4 ft. MWL - Water Level, 10 %of cross sectional area - NO FLOW72.4 ft. MWM - Water Mark, 10 %of cross sectional area

Observation photos (4)

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE

    0 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE

  • General Observation - 48" RCP-FRPP

    8 ft. - General Observation - 48" RCP-FRPP

  • General Observation - 48" RCP-FRPP

    26 ft. - General Observation - 48" RCP-FRPP

  • General Observation - STOPLOG IN PLACE

    72 ft. - General Observation - STOPLOG IN PLACE

Observations (11)

DistanceCodeObservation
0DSZSLUDGE
72MGOSTOPLOG IN PLACE
26MGO48" RCP-FRPP
37.2DSZSLUDGE
0AMH12:55AM
0MWLNO FLOW
72.4AMH1:40AM
8MGO48" RCP-FRPP
0MWM
37.2DSZSLUDGE
72DSZSLUDGE

Properties (7)

additional_info
REVERSE INSPECTION
custom_field_three
LINNER GOOD COND
custom_field_two
1
customer
LACSD
datetime
2018-05-02T00:50:33-07:00
is_lateral_inspection
false
lining
FRPP