Wastewater/Activity/PacpInspection/1.0May 3, 2018, 10:30 AM
  • 18 0865_18 0864_532018_034357.mp4

Date
05/03/2018
W/O
0701634
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00709
PipeID
P14717
Time
3:30 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0848
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
20180501MDM_SO_WHITTIER_OUTFALL_RLF_TR_SECTS_1_2A_2B_2C_3
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
18 0865
Downstream MH
18 0864
Dir. of Survey
Downstream
Length Surveyed
512.9 ft.
Total Length
512.9 ft.
Structural Index
3
Structural Quick
3B24
Structural Rating
53
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
53
Pipe schematic from manhole 18 0865 to 18 0864
MH: 18 0865MH: 18 0864downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:55AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE13.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE20.1 ft. SSS - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE25.9 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC34.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE48.2 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC54.1 ft. MGO - General Observation - 30% MAG COAT START 8:00 TO 4:00126.9 ft. SAV - Surface Aggregate Visible, from 10 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC138.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG142.7 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG142.7 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG184.8 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG188 ft. SAV - Surface Aggregate Visible, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG254 ft. MGO - General Observation - 10% MAG COAT START276.2 ft. SAV - Surface Aggregate Visible, from 04 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC339.3 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG347.4 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC355.2 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG375.6 ft. SAV - Surface Aggregate Visible, from 10 to 12 o'clock, within 8 inches of joint: YES - SEVCERE AGG SPORATIC403.5 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SECVERE AGG418.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC512.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE512.6 ft. MGO - General Observation - MAG COAT 10% FINISH512.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC512.6 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN512.9 ft. AMH - Downstream Manhole, Survey Ends - 5:05AM

Observation photos (21)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    13.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    20.1 ft. - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    25.9 ft. - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    34.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

    48.2 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

  • General Observation - 30% MAG COAT START 8:00 TO 4:00

    54.1 ft. - General Observation - 30% MAG COAT START 8:00 TO 4:00

  • Surface Aggregate Visible, from 10 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    126.9 ft. - Surface Aggregate Visible, from 10 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    138.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    142.7 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG

    142.7 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    184.8 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG

    188 ft. - Surface Aggregate Visible, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • General Observation - 10% MAG COAT START

    254 ft. - General Observation - 10% MAG COAT START

  • Surface Aggregate Visible, from 04 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    276.2 ft. - Surface Aggregate Visible, from 04 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG

    339.3 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    347.4 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

    355.2 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 12 o'clock, within 8 inches of joint: YES - SEVCERE AGG SPORATIC

    375.6 ft. - Surface Aggregate Visible, from 10 to 12 o'clock, within 8 inches of joint: YES - SEVCERE AGG SPORATIC

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SECVERE AGG

    403.5 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SECVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    418.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

Observations (29)

DistanceCodeObservation
48.2SAVSEVERE AGG SPORATIC
20.1SSSPEELING CONCRETE
2SSSBLISTERING PEELING CONCRETE
138.6SAVSEVERE AGG
13.1SSSBLISTERING PEELING CONCRETE
25.9SAVSEVERE AGG SPORATIC
126.9SAVSEVERE AGG SPORATIC
54.1MGO30% MAG COAT START 8:00 TO 4:00
418.5SAVSEVERE AGG SPORATIC
403.5SAVSECVERE AGG
355.2SAVSEVERE AGG
276.2SAVSEVERE AGG SPORATIC
347.4SAVSEVERE AGG SPORATIC
34.8SSSPEELING CONCRETE
188SAVSEVERE AGG
512.6SSSBLISTERING PEELING CONCRETE
0AMH3:55AM
512.6MGOMAG COAT 10% FINISH
0MWL
0MWM
142.7SAVSEVERE AGG
512.9AMH5:05AM
512.6SAVSEVERE AGG SPORATIC
512.6MGOConn. @ Mh, 3 O' Clock. OPEN
184.8SAVSEVERE AGG
142.7SAVSEVERE AGG
254MGO10% MAG COAT START
375.6SAVSEVCERE AGG SPORATIC
339.3SAVSEVERE AGG

Properties (5)

custom_field_three
SEVERE AGG VISIBLE
custom_field_two
3
customer
LACSD
datetime
2018-05-03T03:30:26-07:00
is_lateral_inspection