18 0893_18 0892_512018_052244.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - General Observation - MAG COAT 90% START 8:00 TO 4:00
41.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
97.1 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
101.7 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
161.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
174 ft. - General Observation - 100% MAG COAT
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 113.1 | SAV | SEVERE AGG |
| 97.1 | SAV | SEVERE AGG |
| 0 | MWM | — |
| 161.5 | SSS | BLISTERING CONCRETE |
| 2 | MGO | MAG COAT 90% START 8:00 TO 4:00 |
| 210.7 | AMH | 5:45AM |
| 210.2 | MGO | MAG COAT 90% FINISH |
| 41.4 | SSS | PEELING CONCRETE |
| 0 | MWL | — |
| 174 | MGO | 100% MAG COAT |
| 0 | AMH | 5:20AM |
| 101.7 | SAV | SEVERE AGG |
| 8 | MGO | 27" RCP |
| 210.2 | SSS | BLISTERING PEELING CONCRETE |