Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 18, 2018, 07:18 AM
  • 08 0324_08 0323_09172018_235827.mp4

Date
09/18/2018
W/O
723785
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00013
PipeID
P00372
Time
12:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6030
Sewer Name
08 KEYSTONE TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
13
Purpose
Routine Assessment
Project
WO_723785_TV08154_SEP2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
08 0324
Downstream MH
08 0323
Dir. of Survey
Downstream
Length Surveyed
175.3 ft.
Total Length
175.3 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
99
O&M Index
2
O&M Quick
2F00
O&M Rating
68
Overall Index
2
Overall Quick
Overall Rating
167
Pipe schematic from manhole 08 0324 to 08 0323
MH: 08 0324MH: 08 0323downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 03242 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start34.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"84.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"129.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"172.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish172.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish175.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE175.3 ft. AMH - Downstream Manhole, Survey Ends - 08 0323175.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Downstream Manhole, Survey Ends - 08 0323

    175.3 ft. - Downstream Manhole, Survey Ends - 08 0323

Observations (13)

DistanceCodeObservation
0MWM
175.3MGOCOCKROACHES IN MANHOLE
84.8TF
175.3AMH08 0323
2DAGS
172.8CM
0MWL
34.2TF
172.8DAGS
6CM
0AMH08 0324
175.3MGOACTIVE CONNECTION AT MH 9 O'CLOCK
129.1TFC

Properties (6)

additional_info
SC364794
custom_field_two
2
customer
LACSD
datetime
2018-09-18T00:18:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false