Section#1_18 0763_18 0762__822018__I0049.mp4
2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
6 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00
8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG MISSING UNDER MAG COAT
13.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
24.7 ft. - Surface Reinforcement Visible, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
30.7 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
59.2 ft. - General Observation - MAG COAT 70% START
80.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
96.2 ft. - Water Level, 20 %of cross sectional area
111 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
111 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
111 ft. - General Observation - MAG COAT 50% START 98=:00 TO 3:00
115.8 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
118.2 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR
144.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
295.8 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | MH CONN ACTIVE 3:00 |
| 111 | SAM | SEVERE AGG |
| 2 | SRV | LONG & CIRCUM |
| 440.5 | MGO | MH CONN 9:00 ACTIVE |
| 6 | MGO | MAG COAT 80% START 8:00 TO 4:00 |
| 24.7 | SRV | CIRCUM REBAR |
| 115.8 | SAV | SEVERE AGG |
| 111 | SSS | BLISTERING PEELING CONCRETE |
| 13.6 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWM | — |
| 6 | SRV | LONG & CIRCUM REBAR |
| 393 | MWM | — |
| 96.2 | MWL | — |
| 111 | SAV | SEVERE AGG |
| 440.5 | SAP | SEVERE AGG |
| 111 | MWM | — |
| 59.2 | MGO | MAG COAT 70% START |
| 177.2 | TF | ACTIVE |
| 30.7 | SAM | SEVERE AGG |
| 440.5 | SAM | SEVERE AGG |
| 111 | SSS | BLISTERING PEELING CONCRETE |
| 440.5 | SAV | SEVERE AGG |
| 111 | MGO | MAG COAT 50% START 98=:00 TO 3:00 |
| 118.2 | SRV | LONG REBAR |
| 316.2 | TF | ACTIVE |
| 0 | MWL | — |
| 8 | SAM | SEVERE AGG MISSING UNDER MAG COAT |
| 295.8 | SAM | SEVERE AGG |
| 440.8 | AMH | 2:10AM |
| 144.4 | SAP | SEVERE AGG |
| 80.4 | SSS | BLISTERING PEELING CONCRETE |
| 440.5 | MGO | MAG COAT 70% FINISH |
| 440.5 | SSS | BLISTERING PEELING CONCRETE |
| 159.9 | MGO | MAG COAT 70% START |
| 0 | AMH | 1:15AM |
| 2 | SAM | SEVERE AGG |