Wastewater/Activity/PacpInspection/1.0Jul 27, 2018, 07:30 AM
  • Section#1_18 0443_18 0442__7272018__I0042.mp4

Date
07/27/2018
W/O
O715961
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00675
PipeID
P14294
Time
12:30 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
I0042
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRIMGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
20180727MDM_FLORENCE_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
18 0443
Downstream MH
18 0442
Dir. of Survey
Downstream
Length Surveyed
56.8 ft.
Total Length
56.8 ft.
Structural Index
2
Structural Quick
3A2B
Structural Rating
68
O&M Index
3
O&M Quick
4137
O&M Rating
25
Overall Index
3
Overall Quick
Overall Rating
93
Pipe schematic from manhole 18 0443 to 18 0442
MH: 18 0443MH: 18 0442downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:35AM0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - HARD DEBRIE12.4 ft. MGO - General Observation - 15" VCP17.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE19.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - HARD SLUDGE20.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG20.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SLIGHT25.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED32.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED35.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTCHED44 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG44 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG56.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - FLAKING CONCRETE56.3 ft. MGO - General Observation - MH CONN ACTIVE 3:0056.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED56.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG56.8 ft. AMH - Downstream Manhole, Survey Ends - 12:50AM

Observation photos (8)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • General Observation - 15" VCP

    12.4 ft. - General Observation - 15" VCP

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE

    17.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    20.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    25.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    32.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTCHED

    35.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTCHED

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    44 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

Observations (23)

DistanceCodeObservation
12.4MGO15" VCP
56.2SSSFLAKING CONCRETE
17.4SSSFLAKING CONCRETE
32.8SSSPEELING CONCRETE SEVERE AGG ATTACHED
56.3MGOMH CONN ACTIVE 3:00
0AMH12:35AM
0MGOMH CONN 3:00 ACTIVE
0MWL
19.4DSZHARD SLUDGE
56.3SSSPEELING CONCRETE SEVERE AGG ATTACHED
0MGOMH CONN 9:00 ACTIVE
20.3SAVSEVERE AGG
25.9SSSPEELING CONCRETE SEVERE AGG ATTACHED
56.8AMH12:50AM
2SAVSEVERE AGG
0MWM
0MWM
44SAPSEVERE AGG
44SAVSEVERE AGG
2DSZHARD DEBRIE
20.3SAVSLIGHT
35.7SSSPEELING CONCRETE SEVERE AGG ATTCHED
56.3SAPSEVERE AGG

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2018-07-27T00:30:29-07:00
documentation
MARTIN,REVELES,OLIVER 111,YOUNG
is_lateral_inspection
false