Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 4, 2019, 08:53 PM
  • 29 0541_29 0721_642019_135637.mp4

  • 29 0541_29 0721_642019_135935.mp4

Date
06/04/2019
W/O
0771791
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01019
PipeID
P24739
Time
1:53 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7993
Sewer Name
29 19TH STREET TRUNK
City
LONG BEACH
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20190604DF_19TH_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0721
Downstream MH
29 0541
Dir. of Survey
Upstream
Length Surveyed
17.7 ft.
Total Length
17.7 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 29 0721 to 29 0541
MH: 29 0721MH: 29 0541upstream0 ft. MGO - General Observation - Grease Throughout The Reach (5%)0 ft. AMH - Upstream Manhole, Survey Ends - 2:06 PM1.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. MGP - General Photograph15.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.6 ft. MWM - Water Mark, 15 %of cross sectional area17.7 ft. MWL - Water Level, 10 %of cross sectional area17.7 ft. AMH - Downstream Manhole, Survey Begins - 1:55 PM

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Upstream Manhole, Survey Ends - 2:06 PM

    17.7 ft. - Upstream Manhole, Survey Ends - 2:06 PM

Observations (8)

DistanceCodeObservation
0MWL
15.9MGP
16SSS
0.1MWM
0AMH1:55 PM
2SSS
17.7MGOGrease Throughout The Reach (5%)
17.7AMH2:06 PM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-06-04T13:53:16-07:00
documentation
FRANKLIN, CASTILLO, BRAR
is_lateral_inspection
false