B 0437_B 0434_662019_044119.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING MAG COAT
2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
2 ft. - General Observation - MAG COAT 95% START
10.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT
24.2 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - POSSIBLE CIRCUM REBAR
59.7 ft. - General Observation - 95% MAG COAT
104.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 10.3 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 0 | AMH | 4:40AM |
| 2 | SSS | BLISTERING PEELING MAG COAT |
| 138.1 | TB | Open |
| 104.3 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 284.9 | AMH | 5:05AM |
| 2 | SAV | SEVERE AGG SPORATIC |
| 284.6 | SAV | SEVERE AGG |
| 24.2 | SRV | POSSIBLE CIRCUM REBAR |
| 0 | MWM | — |
| 284.6 | SSS | BLISTERING PEELING CONCRETE |
| 59.7 | MGO | 95% MAG COAT |
| 0 | MWL | — |
| 2 | MGO | MAG COAT 95% START |
| 284.6 | MGO | MAG COAT 95% FINISH |
| 211.3 | MWM | — |