Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2019, 05:03 PM
  • 18 0617_18 0615_632019_113033.mp4

Date
06/03/2019
W/O
0771944
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00692
PipeID
P14467
Time
10:03 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7991
Sewer Name
18 NORTH PLANT OUTFALL RELIEF TRUNK
City
S. WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20190603DF_NORTH_PLANT_OUTFALL_REL_TR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
18 0617
Downstream MH
18 0615
Dir. of Survey
Downstream
Length Surveyed
211.8 ft.
Total Length
211.8 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 18 0617 to 18 0615
MH: 18 0617MH: 18 0615downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:07 AM0.1 ft. MWL - Water Level, 25 %of cross sectional area0.1 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start70.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4" - Open143.3 ft. MGP - General Photograph199.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"209 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish209 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish209 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish209 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 75% MAG211.8 ft. AMH - Downstream Manhole, Survey Ends - 11:55 AM211.8 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)211.8 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active

Observation photos (7)

  • Water Mark, 30 %of cross sectional area

    0.1 ft. - Water Mark, 30 %of cross sectional area

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4" - Open

    70.9 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4" - Open

  • General Photograph

    143.3 ft. - General Photograph

Observations (18)

DistanceCodeObservation
211.8AMH11:55 AM
209SRV
2SRV
70.9TFOpen
0AMH10:07 AM
209SSS
211.8MGOGREASE THROUGHOUT THE REACH (5%)
209SAV
143.3MGP
0.1MWL
2SAV
2SZ75% MAG
209SZ75% MAG
211.8MGOConn. @ Mh, 9 O' Clock. Active
2MGOConn. @ Mh, 9 O' Clock. Active
2SSS
199.5TFA
0.1MWM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-06-03T10:03:16-07:00
documentation
FRANKLIN, CASTILLO, BRAR, RUVALCABA
is_lateral_inspection
false