Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 22, 2019, 11:41 AM
  • 21 0980_21 0979 _03222019_045156.mp4

  • 21 0980_21 0979 _03222019_045156.mp4

Date
03/22/2019
W/O
756623
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00784
PipeID
P16080
Time
4:41 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6490
Sewer Name
21 SAN ANTONIO TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
09
Purpose
Routine Assessment
Project
WO_756623_TV21039_MAR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
21 0980
Downstream MH
21 0979
Dir. of Survey
Downstream
Length Surveyed
361.4 ft.
Total Length
361.4 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
213
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
217
Pipe schematic from manhole 21 0980 to 21 0979
MH: 21 0980MH: 21 0979downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 09805.6 ft. MGO - General Observation - MAG COAT THROUGHOUT PIPE5.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start358.9 ft. MGO - General Observation - MAG COAT THROUGHOUT PIPE358.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish361.4 ft. AMH - Downstream Manhole, Survey Ends - 21 0979

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0MWL
0MWM
358.9MGOMAG COAT THROUGHOUT PIPE
361.4AMH21 0979
5.6MGOMAG COAT THROUGHOUT PIPE
0AMH21 0980
5.6SAP
358.9SAP

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-03-22T04:41:05-07:00
documentation
PROPIPE
is_lateral_inspection
false