Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 19, 2019, 05:15 AM
  • 01 0539_01 0538A_03182019_223436.mp4

Date
03/18/2019
W/O
755958
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00206
PipeID
P01027
Time
10:15 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5832
Sewer Name
01 CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_755958_TV01232_MAR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
01 0539
Downstream MH
01 0538A
Dir. of Survey
Downstream
Length Surveyed
251.9 ft.
Total Length
251.9 ft.
Structural Index
4
Structural Quick
4332
Structural Rating
18
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
24
Pipe schematic from manhole 01 0539 to 01 0538A
MH: 01 0539MH: 01 0538Adownstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 05392 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.3 ft. FM - Fracture Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES, Start14.3 ft. FM - Fracture Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES, Finish16.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"42 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"48.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES55.4 ft. RFB - Roots Fine Barrell, from 12 to 02 o'clock, within 8 inches of joint: NO58 ft. RFB - Roots Fine Barrell, from 12 to 01 o'clock, within 8 inches of joint: NO61.1 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES67.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start80.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.3 ft. RPP - Repair Patch, from 10 to 01 o'clock, within 8 inches of joint: YES - PVC164.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"167 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"203.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"208.6 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start242.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"244.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"248.7 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish248.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish248.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish251.9 ft. AMH - Downstream Manhole, Survey Ends - 01 0538A251.9 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH

Observation photos (8)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Fracture Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    48.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Roots Fine Barrell, from 12 to 02 o'clock, within 8 inches of joint: NO

    55.4 ft. - Roots Fine Barrell, from 12 to 02 o'clock, within 8 inches of joint: NO

  • Roots Fine Barrell, from 12 to 01 o'clock, within 8 inches of joint: NO

    58 ft. - Roots Fine Barrell, from 12 to 01 o'clock, within 8 inches of joint: NO

  • Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    61.1 ft. - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    70.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Repair Patch, from 10 to 01 o'clock, within 8 inches of joint: YES - PVC

    140.3 ft. - Repair Patch, from 10 to 01 o'clock, within 8 inches of joint: YES - PVC

Observations (29)

DistanceCodeObservation
80.3TF
55.4RFB
208.6DSC
203.2TF
58RFB
98.3TF
251.9AMH01 0538A
3.3FM
140.3RPPPVC
248.7DSC
48.3FM
0MWM
164.4TF
67.4TF
70.7FM
248.7SAV
0MWL
42TF
16.4TF
167TF
61.1FL
242.1TF
0AMH01 0539
14.3FM
244.2TF
2SAV
131.4TF
248.7FM
251.9MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH

Properties (6)

additional_info
SC366063
custom_field_two
2
customer
LACSD
datetime
2019-03-18T22:15:39-07:00
documentation
PROPIPE
is_lateral_inspection
false