Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 18, 2019, 08:38 AM
  • 02 1511_H 0215_03182019_020051.mp4

Date
03/18/2019
W/O
755954
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00170
PipeID
P11246
Time
1:38 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5830
Sewer Name
H JOINT OUTFALL H - UNIT 2D
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_755954_TV02223_MAR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
02 1511
Downstream MH
H 0215
Dir. of Survey
Downstream
Length Surveyed
14.9 ft.
Total Length
14.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4222
O&M Rating
12
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 02 1511 to H 0215
MH: 02 1511MH: H 0215downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 02 15113.5 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start - MAG COATING3.5 ft. SAP - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start3.5 ft. MGO - General Observation - LIGHT STEAM IN SEWER3.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start11 ft. LU - Alignment Up, 25 % - STRAIGHTENS OUT14.9 ft. AMH - Downstream Manhole, Survey Ends - H 021514.9 ft. MCU - Camera Underwater - AT MH14.9 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish14.9 ft. SAP - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Finish14.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (4)

  • Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start - MAG COATING

    3.5 ft. - Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start - MAG COATING

  • Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start

    3.5 ft. - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Alignment Up, 25 % - STRAIGHTENS OUT

    11 ft. - Alignment Up, 25 % - STRAIGHTENS OUT

Observations (14)

DistanceCodeObservation
0MWL
14.9AMHH 0215
14.9MCUAT MH
3.5DAZMAG COATING
0MWM
3.5SAP
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
11LUSTRAIGHTENS OUT
3.5MGOLIGHT STEAM IN SEWER
14.9DAZ
3.5DAGS
14.9SAP
14.9DAGS
0AMH02 1511

Properties (6)

additional_info
SC366061
custom_field_two
3
customer
LACSD
datetime
2019-03-18T01:38:53-07:00
documentation
PROPIPE
is_lateral_inspection
false