21 1024_21 1023 _03262019_033103.mp4
3.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
5.3 ft. - Crack Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES
10.4 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES
18.7 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES
60.2 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES
72.5 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES
184.6 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES
317 ft. - Crack Spiral, from 09 to 02 o'clock, within 8 inches of joint: YES
332.8 ft. - Crack Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 238.4 | TFC | — |
| 10.4 | CS | — |
| 172.4 | TFC | — |
| 72.5 | FM | — |
| 371.9 | AMH | 21 1023 |
| 174.9 | TFC | — |
| 106.4 | TFC | — |
| 241 | TFC | — |
| 109 | TFC | — |
| 5.3 | CS | — |
| 58.9 | TFC | — |
| 3.5 | DAGS | — |
| 304.5 | TFC | — |
| 317 | CS | — |
| 371.9 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 0 | MWL | — |
| 60.2 | CS | — |
| 56.4 | TFC | — |
| 184.6 | CM | — |
| 0 | MWM | — |
| 9 | TFC | — |
| 307.3 | TFC | — |
| 368.9 | DAGS | — |
| 18.7 | CS | — |
| 332.8 | CS | — |
| 0 | AMH | 21 1024 |
| 6.4 | TFC | — |