Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 12, 2019, 07:14 AM
  • 22 0278_22 0277 _02112019_232354.mp4

Date
02/11/2019
W/O
745519
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16564
Time
11:14 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6390
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_745519_TV22014_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0278
Downstream MH
22 0277
Dir. of Survey
Downstream
Length Surveyed
159.4 ft.
Total Length
159.4 ft.
Structural Index
3
Structural Quick
3E2D
Structural Rating
150
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
2
Overall Quick
Overall Rating
212
Pipe schematic from manhole 22 0278 to 22 0277
MH: 22 0278MH: 22 0277downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02780 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES22.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start29.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish157.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish157.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish159.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0277159.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    6.3 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    22.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
157.1SAP
2DAGS
0AMH22 0278
159.4AMH22 0277
22.4SSS
0MWL
29.4TFC
157.1DAGS
157.1SSS
159.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2SAP
6.3FL
0MWM

Properties (6)

additional_info
SC365901
custom_field_two
2
customer
LACSD
datetime
2019-02-11T23:14:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false