Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 8, 2019, 07:17 AM
  • 22 0283_22 0282_02072019_233105.mp4

Date
02/07/2019
W/O
745519
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16569
Time
11:17 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6387
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_745519_TV22014_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0282
Downstream MH
22 0283
Dir. of Survey
Upstream
Length Surveyed
138.3 ft.
Total Length
138.3 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
135
O&M Index
2
O&M Quick
512D
O&M Rating
59
Overall Index
2
Overall Quick
Overall Rating
194
Pipe schematic from manhole 22 0282 to 22 0283
MH: 22 0282MH: 22 0283upstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. OBZ - Obstacles Other, 50 %of cross sectional area, from 04 to 10 o'clock - DEBRIS0 ft. MSA - Survey Abandoned - DUE TO DEBRIS. REVERSAL COMPLETE.0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish52.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"136.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start136.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start136.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start138.3 ft. MWL - Water Level, 20 %of cross sectional area138.3 ft. AMH - Downstream Manhole, Survey Begins - 22 0282138.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Other, 50 %of cross sectional area, from 04 to 10 o'clock - DEBRIS

    138.3 ft. - Obstacles Other, 50 %of cross sectional area, from 04 to 10 o'clock - DEBRIS

  • Survey Abandoned - DUE TO DEBRIS.  REVERSAL COMPLETE.

    138.3 ft. - Survey Abandoned - DUE TO DEBRIS. REVERSAL COMPLETE.

Observations (14)

DistanceCodeObservation
2DAGS
0MWL
138.3DAGS
86TFA
138.3SAP
138.3OBZDEBRIS
2SAP
0AMH22 0282
138.3MSADUE TO DEBRIS. REVERSAL COMPLETE.
13.4TFA
2SSS
41.2TFA
138.3SSS
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC365698
custom_field_two
5
customer
LACSD
datetime
2019-02-07T23:17:05-08:00
documentation
PRO PIPE
is_lateral_inspection
false