Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 12, 2019, 05:36 AM
  • 22 0281_22 0280 _02112019_221246.mp4

Date
02/11/2019
W/O
745519
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16567
Time
9:36 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6390
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_745519_TV22014_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0281
Downstream MH
22 0280
Dir. of Survey
Downstream
Length Surveyed
212.8 ft.
Total Length
212.8 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
3122
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 22 0281 to 22 0280
MH: 22 0281MH: 22 0280downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02810 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.3 ft. MGO - General Observation - MAG COATING 50% THROUGHOUT45.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"76.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"97.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.9 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"157.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"212.8 ft. OBZ - Obstacles Other, 20 %of cross sectional area, from 02 to 08 o'clock - DEBRIS212.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish212.8 ft. MSA - Survey Abandoned - DUE TO OBSTACLE,.212.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Obstacles Other, 20 %of cross sectional area, from 02 to 08 o'clock - DEBRIS

    212.8 ft. - Obstacles Other, 20 %of cross sectional area, from 02 to 08 o'clock - DEBRIS

  • Survey Abandoned - DUE TO OBSTACLE,.

    212.8 ft. - Survey Abandoned - DUE TO OBSTACLE,.

Observations (18)

DistanceCodeObservation
212.8OBZDEBRIS
212.8DAGS
5.3MGOMAG COATING 50% THROUGHOUT
0MWM
76.6TFA
212.8MSADUE TO OBSTACLE,.
212.8SAP
2SAP
161.9TFC
104.8TFC
157.7TFC
149.9TBA
2DAGS
0AMH22 0281
45.1TFA
0MWL
101.1TBA
97.2TBA

Properties (6)

additional_info
SC365901
custom_field_two
5
customer
LACSD
datetime
2019-02-11T21:36:07-08:00
documentation
PRO PIPE
is_lateral_inspection
false