Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2019, 10:32 AM
  • 22 0293_22 0292_02052019_024853.mp4

Date
02/05/2019
W/O
745519
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16579
Time
2:32 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6381
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_745519_TV22014_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0292
Downstream MH
22 0293
Dir. of Survey
Upstream
Length Surveyed
350.4 ft.
Total Length
350.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0292 to 22 0293
MH: 22 0292MH: 22 0293upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02930 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK1.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish65.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"73.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"138 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"142.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"219.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"223.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"231.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"348.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start348.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start348.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start350.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK350.4 ft. MWL - Water Level, 15 %of cross sectional area350.4 ft. MWM - Water Mark, 20 %of cross sectional area350.4 ft. AMH - Downstream Manhole, Survey Begins - 22 0292

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
212.4TFA
126.7TFA
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2SSS
348.9SAP
350.4AMH22 0293
0MWL
0MWM
277.1TFA
130.7TFA
2DAGS
2SAP
348.9SSS
285.2TFA
350.4MGOACTIVE CONNECTION AT MH 9 O'CLOCK
348.9DAGS
208.1TFA
0AMH22 0292
118.7TFC

Properties (6)

additional_info
SC365693
custom_field_two
2
customer
LACSD
datetime
2019-02-05T02:32:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false