Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2019, 09:50 AM
  • 29 0744_29 0743 _01292019_021204.mpg

Date
01/29/2019
W/O
745429
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00527
PipeID
P24250
Time
1:50 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5355
Sewer Name
29 ALAMITOS PUMPING PLANT TRUNK
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_745429_TV29078_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0744
Downstream MH
29 0743
Dir. of Survey
Downstream
Length Surveyed
325.4 ft.
Total Length
325.4 ft.
Structural Index
3
Structural Quick
423L
Structural Rating
206
O&M Index
1
O&M Quick
321H
O&M Rating
53
Overall Index
2
Overall Quick
Overall Rating
259
Pipe schematic from manhole 29 0744 to 29 0743
MH: 29 0744MH: 29 0743downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 07440 ft. MWM - Water Mark, 15 %of cross sectional area2.4 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start11.7 ft. RFJ - Roots Fine Joint, from 03 to 04 o'clock, within 8 inches of joint: YES19.4 ft. RFJ - Roots Fine Joint, at 08 o'clock, within 8 inches of joint: YES22 ft. RFJ - Roots Fine Joint, from 08 to 10 o'clock, within 8 inches of joint: YES32.2 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - DEBRIS54.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - DEBRIS111.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"183.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - DEBRIS210.4 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES246.7 ft. RMJ - Roots Medium Joint, from 07 to 05 o'clock, 5 %, within 8 inches of joint: YESR246.7 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish268.9 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR311.1 ft. RFJ - Roots Fine Joint, at 08 o'clock, within 8 inches of joint: YES311.2 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES315 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"317.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - DEBRIS319.2 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES321.7 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES323 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish325.4 ft. AMH - Downstream Manhole, Survey Ends - 29 0743325.4 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK

Observation photos (10)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 03 to 04 o'clock, within 8 inches of joint: YES

    11.7 ft. - Roots Fine Joint, from 03 to 04 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 08 to 10 o'clock, within 8 inches of joint: YES

    22 ft. - Roots Fine Joint, from 08 to 10 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    32.2 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    210.4 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Roots Medium Joint, from 07 to 05 o'clock, 5 %, within 8 inches of joint: YESR

    246.7 ft. - Roots Medium Joint, from 07 to 05 o'clock, 5 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR

    268.9 ft. - Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR

  • Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    311.2 ft. - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES

    319.2 ft. - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    321.7 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (25)

DistanceCodeObservation
0MWL
268.9RMJ
319.2FL
311.1RFJ
323SAP
183.4TFDEBRIS
111.2TF
32.2RFJ
246.7RMJ
51.5TFDEBRIS
210.4FM
311.2FL
0AMH29 0744
19.4RFJ
317.6TBDEBRIS
325.4AMH29 0743
22RFJ
0MWM
2.4SAP
325.4MGOCONNECTION AT MH 3 OCLOCK
321.7FM
246.7RFJ
315TFC
11.7RFJ
54.3TFDEBRIS

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-01-29T01:50:01-08:00
documentation
PROPIPE
is_lateral_inspection
false