Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2019, 08:12 AM
  • 15 0638_15 0637_04092019_012403.mp4

Date
04/09/2019
W/O
761478
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00606
PipeID
P12910
Time
1:12 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6450
Sewer Name
15 GRAND AVENUE TRUNK
City
SAN GABRIEL
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
WO_761478_TV15027_APR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0638
Downstream MH
15 0637
Dir. of Survey
Downstream
Length Surveyed
134.5 ft.
Total Length
134.5 ft.
Structural Index
3
Structural Quick
3E00
Structural Rating
84
O&M Index
2
O&M Quick
2D00
O&M Rating
52
Overall Index
3
Overall Quick
Overall Rating
136
Pipe schematic from manhole 15 0638 to 15 0637
MH: 15 0638MH: 15 0637downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06382 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.5 ft. MMC - Material Change, Cast Iron8.5 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish14.1 ft. MMC - Material Change, Concrete pipe (non-reinfored)14.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.1 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish132 ft. MMC - Material Change, Vitrified clay pipe132 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish133.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish134.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK134.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0637

Observation photos (6)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Material Change, Cast Iron

    8.5 ft. - Material Change, Cast Iron

  • Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.5 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Concrete pipe (non-reinfored)

    14.1 ft. - Material Change, Concrete pipe (non-reinfored)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0MWM
2SAP
134.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
134.5AMH15 0637
0MWL
8.5MMC
133.2DAGS
14.1MMC
2DAGS
14.1SAP
8.5SCP
132MMC
0AMH15 0638
132SAP
8.5SAP
14.1SCP

Properties (6)

additional_info
SC366218
custom_field_two
2
customer
LACSD
datetime
2019-04-09T01:12:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false