15 0638_15 0637_04092019_012403.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
8.5 ft. - Material Change, Cast Iron
8.5 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
14.1 ft. - Material Change, Concrete pipe (non-reinfored)
14.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 2 | SAP | — |
| 134.4 | MGO | ACTIVE CONNECTION AT MH 3 O'CLOCK |
| 134.5 | AMH | 15 0637 |
| 0 | MWL | — |
| 8.5 | MMC | — |
| 133.2 | DAGS | — |
| 14.1 | MMC | — |
| 2 | DAGS | — |
| 14.1 | SAP | — |
| 8.5 | SCP | — |
| 132 | MMC | — |
| 0 | AMH | 15 0638 |
| 132 | SAP | — |
| 8.5 | SAP | — |
| 14.1 | SCP | — |