Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 5, 2019, 05:17 AM
  • 15 0657_15 0656 _04042019_223558.mp4

Date
04/04/2019
W/O
761478
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00606
PipeID
P12929
Time
10:17 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6448
Sewer Name
15 GRAND AVENUE TRUNK
City
SAN GABRIEL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_761478_TV15027_APR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0657
Downstream MH
15 0656
Dir. of Survey
Downstream
Length Surveyed
309.9 ft.
Total Length
309.9 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
2
Overall Quick
Overall Rating
128
Pipe schematic from manhole 15 0657 to 15 0656
MH: 15 0657MH: 15 0656downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06572 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.5 ft. MGO - General Observation - MAG COATING THROUGHOUT 60%.4.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start51.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"69.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"76.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"102.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"132.3 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"154.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"178.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.8 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 8"202.9 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"245.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"267.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"303.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"307.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish307.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0656

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT 60%.

    4.5 ft. - General Observation - MAG COATING THROUGHOUT 60%.

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
102.9TF
0MWL
154.4TFC
309.9AMH15 0656
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
4.5MGOMAG COATING THROUGHOUT 60%.
307.8SAP
2DAGS
202.9TB
300.6TF
0MWM
4.5SAP
245.5TFA
178.8TF
190.8TBA
0AMH15 0657
132.3TBA
51.6TFA
69.8TF
76.1TFA
307.8DAGS
303.4TFA
267.9TFC

Properties (6)

additional_info
SC366216
custom_field_two
2
customer
LACSD
datetime
2019-04-04T22:17:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false