Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 8, 2019, 10:49 AM
  • 15 0643_15 0642_04082019_035756.mp4

Date
04/08/2019
W/O
761478
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00606
PipeID
P12915
Time
3:49 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6449
Sewer Name
15 GRAND AVENUE TRUNK
City
SAN GABRIEL
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
WO_761478_TV15027_APR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0643
Downstream MH
15 0642
Dir. of Survey
Downstream
Length Surveyed
213.9 ft.
Total Length
213.9 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
208
O&M Index
2
O&M Quick
2G00
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
292
Pipe schematic from manhole 15 0643 to 15 0642
MH: 15 0643MH: 15 0642downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 06430 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start211.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish211.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish211.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish213.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK213.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0642

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0AMH15 0643
213.9MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWM
211.5SAP
211.5DAGS
0MWL
2DAGS
2SAP
213.9AMH15 0642
6.9SSS
211.5SSS
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC366217
custom_field_two
2
customer
LACSD
datetime
2019-04-08T03:49:15-07:00
documentation
PRO PIPE
is_lateral_inspection