- Date
- 04/05/2019
- W/O
- 761478
- Weather
- Dry
- Operator/Surveyor
- S. LOPEZ
- Sewer ID
- Z00606
- PipeID
- P12930
- Time
- 1:01 AM
- Certificate
- U-111-11880
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K6448
- Sewer Name
- 15 GRAND AVENUE TRUNK
- City
- SAN GABRIEL
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 15
- Page No.
- 10
- Purpose
- Routine Assessment
- Project
- WO_761478_TV15027_APR2019
- Sewer Type
- Gravity
- Material
- NRCP
- Shape
- Circular
- Height
- 15 in.
- Width
- 15 in.
- Upstream MH
- 15 0657
- Downstream MH
- 15 0658
- Dir. of Survey
- Upstream
- Length Surveyed
- 306.6 ft.
- Total Length
- 306.6 ft.
- Structural Index
- 3
- Structural Quick
- 3K00
- Structural Rating
- 183
- O&M Index
- 2
- O&M Quick
- 2K00
- O&M Rating
- 122
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 305
Pipe schematic from manhole 15 0657 to 15 0658 Observation photos (2)

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start