Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 7, 2019, 07:54 AM
  • 01 1127_01 1126_03072019_011459.mp4

Date
03/06/2019
W/O
750757
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00210
PipeID
P01979
Time
11:54 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6464
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_750757_TV01246_FEB2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 1127
Downstream MH
01 1126
Dir. of Survey
Downstream
Length Surveyed
291.3 ft.
Total Length
291.3 ft.
Structural Index
3
Structural Quick
3421
Structural Rating
14
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole 01 1127 to 01 1126
MH: 01 1127MH: 01 1126downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 01 11270 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES19.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"21.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES28.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start47.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start73.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"76 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"76 ft. RTL - Roots Tap Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES114.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"124.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"155.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"166 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"192.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"202.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"207.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish249.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"259.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"281.1 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES283.8 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES288.1 ft. MGO - General Observation - OFFSET IN LATERAL288.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"291.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish291.3 ft. AMH - Downstream Manhole, Survey Ends - 01 1126

Observation photos (8)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    3 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    21.7 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    28.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    47.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Roots Tap Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES

    76 ft. - Roots Tap Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    281.1 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    283.8 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • General Observation - OFFSET IN LATERAL

    288.1 ft. - General Observation - OFFSET IN LATERAL

Observations (28)

DistanceCodeObservation
155.8TFA
19.5TBA
124.8TF
0MWM
291.3DAGS
291.3AMH01 1126
281.1CM
202.5TFA
76TFA
3CM
114.4TF
28.2CM
21.7CM
166TFA
0MWL
249.1TFA
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
192.1TFA
73.1TFA
288.1MGOOFFSET IN LATERAL
288.1TFA
259.5TFA
207.2CM
47.4DAGS
0AMH01 1127
76RTL
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
283.8CL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-03-06T23:54:46-08:00
documentation
PROPIPE
is_lateral_inspection
false