Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 14, 2019, 05:59 AM
  • 08 0011_08 0010_02132019_221511.mp4

Date
02/13/2019
W/O
745602
Weather
Light Rain
Operator/Surveyor
E.RUIZ
Sewer ID
Z00016
PipeID
P00011
Time
9:59 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6273
Sewer Name
08 MAIN STREET TRUNK
City
GARGENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_745602_TV08115_JAN2019
Sewer Type
Gravity
Material
RCP-CTL
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
08 0011
Downstream MH
08 0010
Dir. of Survey
Downstream
Length Surveyed
266.1 ft.
Total Length
266.1 ft.
Structural Index
4
Structural Quick
4100
Structural Rating
4
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
8
Pipe schematic from manhole 08 0011 to 08 0010
MH: 08 0011MH: 08 0010downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 00110 ft. MWL - Water Level, 50 %of cross sectional area0.8 ft. MWM - Water Mark, 55 %of cross sectional area7.9 ft. MB - Missing Brick, from 09 to 03 o'clock, Start266.1 ft. MB - Missing Brick, from 09 to 03 o'clock, Finish266.1 ft. AMH - Downstream Manhole, Survey Ends - 08 0010

Observation photos (1)

  • Missing Brick, from 09 to 03 o'clock, Start

    7.9 ft. - Missing Brick, from 09 to 03 o'clock, Start

Observations (6)

DistanceCodeObservation
266.1MB
266.1AMH08 0010
0AMH08 0011
7.9MB
0MWL
0.8MWM

Properties (5)

custom_field_two
1
customer
LACSD
datetime
2019-02-13T21:59:23-08:00
documentation
PROPIPE
is_lateral_inspection
false