Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 8, 2019, 09:32 AM
  • 01 0195_01 0194_01082019_013720.mp4

Date
01/08/2019
W/O
740026
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00202
PipeID
P01237
Time
1:32 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5331
Sewer Name
01 COMPTON AVENUE TRUNK
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_740026_TV01237_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Square
Height
15 in.
Width
15 in.
Upstream MH
01 0195
Downstream MH
01 0194
Dir. of Survey
Downstream
Length Surveyed
57.9 ft.
Total Length
57.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 01 0195 to 01 0194
MH: 01 0195MH: 01 0194downstream0 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 01 01956.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start22.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"43.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"46 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"54.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish57.9 ft. AMH - Downstream Manhole, Survey Ends - 01 019457.9 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH

Observations (11)

DistanceCodeObservation
22.8TFC
57.9AMH01 0194
6.2CM
43.8TFC
0MWM
0MWL
57.9MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
46TFC
54.5CM
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
0AMH01 0195

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-01-08T01:32:24-08:00
documentation
PROPIPE
is_lateral_inspection
false