Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 8, 2019, 08:06 AM
  • 01 0204_01 0203_01082019_002110.mp4

Date
01/08/2019
W/O
740026
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00202
PipeID
P01246
Time
12:06 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5331
Sewer Name
01 COMPTON AVENUE TRUNK
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_740026_TV01237_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0204
Downstream MH
01 0203
Dir. of Survey
Downstream
Length Surveyed
275.5 ft.
Total Length
275.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 01 0204 to 01 0203
MH: 01 0204MH: 01 0203downstream0 ft. MWL - Water Level, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02040 ft. MWM - Water Mark, 55 %of cross sectional area5.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start48.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"60.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"63.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"106.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start119.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"144.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"162.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"184 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"201.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"244.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"274.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish274.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish275.5 ft. AMH - Downstream Manhole, Survey Ends - 01 0203275.5 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH

Observation photos (2)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.1 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    106.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
274.5DAGS
275.5AMH01 0203
244.6TFA
106.7DAGS
48.4TFA
0MWL
201.3TFA
144.8TFA
275.5MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
63.7TFA
60.9TFA
5.1CM
162.9TBA
119.6TFA
0AMH01 0204
0MWM
274.5CM
184TFA

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-01-08T00:06:25-08:00
documentation
PROPIPE
is_lateral_inspection
false