Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 14, 2019, 07:35 AM
  • 14 0541_14 0540 _03142019_010130.mp4

Date
03/14/2019
W/O
750675
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18632
Time
12:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6425
Sewer Name
14 35TH STREET WEST TRUNK
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_750675_TV14074_FEB2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 0541
Downstream MH
14 0540
Dir. of Survey
Downstream
Length Surveyed
493.9 ft.
Total Length
493.9 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
490
O&M Index
2
O&M Quick
2S00
O&M Rating
196
Overall Index
2
Overall Quick
Overall Rating
686
Pipe schematic from manhole 14 0541 to 14 0540
MH: 14 0541MH: 14 0540downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 05410 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start493 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish493 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish493 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish493.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0540

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMH14 0541
493.9AMH14 0540
2SSS
0MWL
2DAGS
2SAP
493DAGS
493SSS
0MWM
493SAP

Properties (5)

additional_info
SC365942
custom_field_two
2
customer
LACSD
datetime
2019-03-14T00:35:16-07:00
is_lateral_inspection
false