Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 13, 2019, 09:22 AM
  • 14 0535B_14 0535A _03132019_023546.mp4

Date
03/13/2019
W/O
750675
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18626
Time
2:22 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6424
Sewer Name
14 35TH STREET WEST TRUNK
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_750675_TV14074_FEB2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 0535A
Downstream MH
14 0535B
Dir. of Survey
Upstream
Length Surveyed
202.7 ft.
Total Length
202.7 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
200
O&M Index
2
O&M Quick
2G00
O&M Rating
80
Overall Index
2
Overall Quick
Overall Rating
280
Pipe schematic from manhole 14 0535A to 14 0535B
MH: 14 0535AMH: 14 0535Bupstream0 ft. AMH - Upstream Manhole, Survey Ends - 14 0535B0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK1.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish200.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start200.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start200.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start202.7 ft. AMH - Downstream Manhole, Survey Begins - 14 0535A202.7 ft. MWL - Water Level, 20 %of cross sectional area202.7 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
202.7AMH14 0535B
0AMH14 0535A
2SAP
0MWL
200.9SSS
202.7MGOACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK
200.9SAP
2SSS
0MWM
2DAGS
200.9DAGS

Properties (5)

additional_info
SC365941
custom_field_two
2
customer
LACSD
datetime
2019-03-13T02:22:32-07:00
is_lateral_inspection
false