Wastewater/Activity/PacpInspection/1.0Apr 11, 2019, 04:51 AM
  • 01 0062_01 0061_04102019_225019.mp4

Date
04/10/2019
W/O
761341
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00209
PipeID
P00731
Time
9:51 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5926
Sewer Name
01 HOOPER AVENUE-COMPTON CREEK TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
WO_761341_TV01254_APR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0062
Downstream MH
01 0061
Dir. of Survey
Downstream
Length Surveyed
364.3 ft.
Total Length
364.3 ft.
Structural Index
4
Structural Quick
4300
Structural Rating
12
O&M Index
3
O&M Quick
4637
O&M Rating
48
Overall Index
3
Overall Quick
Overall Rating
60
Pipe schematic from manhole 01 0062 to 01 0061
MH: 01 0062MH: 01 0061downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 00620 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 45 %of cross sectional area34.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"36.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"36.2 ft. RFL - Roots Fine Lateral, at 10 o'clock36.9 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES, Start36.9 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES40.3 ft. FM - Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES46.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start75.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"75.8 ft. RBL - Roots Ball Lateral, at 02 o'clock, 85 %78.6 ft. RBL - Roots Ball Lateral, at 10 o'clock, 90 %78.6 ft. RMC - Roots Medium Connection, at 10 o'clock, 30 %, within 8 inches of joint: YES78.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"112.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"112.6 ft. RBL - Roots Ball Lateral, at 02 o'clock, 75 %121.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"121.2 ft. RFL - Roots Fine Lateral, at 10 o'clock133.3 ft. RML - Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES133.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"153 ft. RMC - Roots Medium Connection, at 02 o'clock, 30 %, within 8 inches of joint: YES155.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"155.1 ft. RBL - Roots Ball Lateral, at 02 o'clock, 95 %168.3 ft. RMC - Roots Medium Connection, at 02 o'clock, 20 %, within 8 inches of joint: YES169.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"169.8 ft. RBL - Roots Ball Lateral, at 02 o'clock, 95 %196.9 ft. RML - Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES196.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"212 ft. RML - Roots Medium Lateral, at 10 o'clock, 25 %, within 8 inches of joint: YES212 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"235.9 ft. RML - Roots Medium Lateral, at 02 o'clock, 25 %, within 8 inches of joint: YES235.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"273.1 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish282 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"284.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"328.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"330.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"359.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish363.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED364.3 ft. AMH - Downstream Manhole, Survey Ends - 01 0061364.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (20)

  • Roots Fine Lateral, at 10 o'clock

    36.2 ft. - Roots Fine Lateral, at 10 o'clock

  • Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    36.9 ft. - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    36.9 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

    40.3 ft. - Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    46.6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Ball Lateral, at 02 o'clock, 85 %

    75.8 ft. - Roots Ball Lateral, at 02 o'clock, 85 %

  • Roots Ball Lateral, at 10 o'clock, 90 %

    78.6 ft. - Roots Ball Lateral, at 10 o'clock, 90 %

  • Roots Medium Connection, at 10 o'clock, 30 %, within 8 inches of joint: YES

    78.6 ft. - Roots Medium Connection, at 10 o'clock, 30 %, within 8 inches of joint: YES

  • Roots Ball Lateral, at 02 o'clock, 75 %

    112.6 ft. - Roots Ball Lateral, at 02 o'clock, 75 %

  • Roots Fine Lateral, at 10 o'clock

    121.2 ft. - Roots Fine Lateral, at 10 o'clock

  • Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES

    133.3 ft. - Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES

  • Roots Medium Connection, at 02 o'clock, 30 %, within 8 inches of joint: YES

    153 ft. - Roots Medium Connection, at 02 o'clock, 30 %, within 8 inches of joint: YES

  • Roots Ball Lateral, at 02 o'clock, 95 %

    155.1 ft. - Roots Ball Lateral, at 02 o'clock, 95 %

  • Roots Medium Connection, at 02 o'clock, 20 %, within 8 inches of joint: YES

    168.3 ft. - Roots Medium Connection, at 02 o'clock, 20 %, within 8 inches of joint: YES

  • Roots Ball Lateral, at 02 o'clock, 95 %

    169.8 ft. - Roots Ball Lateral, at 02 o'clock, 95 %

  • Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES

    196.9 ft. - Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: YES

  • Roots Medium Lateral, at 10 o'clock, 25 %, within 8 inches of joint: YES

    212 ft. - Roots Medium Lateral, at 10 o'clock, 25 %, within 8 inches of joint: YES

  • Roots Medium Lateral, at 02 o'clock, 25 %, within 8 inches of joint: YES

    235.9 ft. - Roots Medium Lateral, at 02 o'clock, 25 %, within 8 inches of joint: YES

  • General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED

    363.4 ft. - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED

  • General Observation - CONNECTION AT MH 3 O'CLOCK

    364.3 ft. - General Observation - CONNECTION AT MH 3 O'CLOCK

Observations (42)

DistanceCodeObservation
112.6TF
133.3RML
364.3AMH01 0061
196.9RML
155.1TF
330.5TF
36.2TF
364.3MGOCONNECTION AT MH 3 O'CLOCK
169.8TF
155.1RBL
75.8TF
235.9RML
78.6RBL
169.8RBL
153RMC
328.2TF
78.6RMC
212RML
36.9RFJ
282TF
133.3TF
36.2RFL
0AMH01 0062
212TF
75.8RBL
112.6RBL
235.9TF
121.2TF
273.1RFJ
40.3FM
196.9TF
78.6TF
363.4MGOCONNECTION AT MH 9 O'CLOCK CAPPED
121.2RFL
34.5TF
168.3RMC
36.9FM
0MWM
284.6TF
0MWL
46.6FM
359.9FM