Wastewater/Activity/PacpInspection/1.0Apr 26, 2019, 09:04 AM
  • 22 0493_22 0492 _04262019_021801.mp4

Date
04/26/2019
W/O
761339
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00800
PipeID
P16832
Time
2:04 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6511
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_761339_TV22031_APR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
22 0492
Downstream MH
22 0493
Dir. of Survey
Upstream
Length Surveyed
169.6 ft.
Total Length
169.6 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
162
O&M Index
2
O&M Quick
2F00
O&M Rating
66
Overall Index
3
Overall Quick
Overall Rating
228
Pipe schematic from manhole 22 0492 to 22 0493
MH: 22 0492MH: 22 0493upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 04930 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.2 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish41.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"44.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"93 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start142.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"146.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"167.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start167.6 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start169.6 ft. MWM - Water Mark, 20 %of cross sectional area169.6 ft. AMH - Downstream Manhole, Survey Begins - 22 0493169.6 ft. MWL - Water Level, 10 %of cross sectional area169.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    60.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWM
60.2CM
0AMH22 0493
169.6AMH22 0493
23.5TFA
2DAGS
169.6MGOCONNECTION AT MH 3 O'CLOCK
74.4TFC
125.1TFA
167.4CM
0MWL
167.4SAP
127.8TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
76.6TFC
167.4DAGS
2SAP
26.7TFC

Properties (6)

additional_info
SC366230
custom_field_two
2
customer
LACSD
datetime
2019-04-26T02:04:26-07:00
documentation
PRO PIPE
is_lateral_inspection
false