Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 26, 2019, 09:52 AM
  • 22 0491_22 0490 _04262019_033043.mp4

Date
04/26/2019
W/O
761339
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00800
PipeID
P16830
Time
2:52 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6511
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_761339_TV22031_APR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
22 0491
Downstream MH
22 0490
Dir. of Survey
Downstream
Length Surveyed
314.7 ft.
Total Length
314.7 ft.
Structural Index
3
Structural Quick
413X
Structural Rating
373
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
3
Overall Quick
Overall Rating
497
Pipe schematic from manhole 22 0491 to 22 0490
MH: 22 0491MH: 22 0490downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 04910 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"10 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"11.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start48 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"65.4 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES66.5 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES66.5 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"100.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.8 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"151.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"154.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"175.8 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"183.8 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"208.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"216.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"219.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"249.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"251.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"296.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"299.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"312.3 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish312.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish312.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK314.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0490

Observation photos (5)

  • Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    65.4 ft. - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    66.5 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (32)

DistanceCodeObservation
51.4TFC
0AMH22 0491
133.8TBA
183.8TBA
2SAP
249.7TFC
151.2TFC
0MWM
0MWL
66.5FM
2DAGS
314.7MGOACTIVE CONNECTION AT MH 3 O'CLOCK
154.5TFC
10TFA
104.3TFC
299.9TFC
66.5TBA
65.4FL
314.7AMH22 0490
7.6TFC
296.7TFC
100.9TFC
312.3SAP
216.5TFC
175.8TBA
11.8CM
251.9TFC
219.7TFC
312.3DAGS
48TFA
312.3CM
208.2TBA

Properties (6)

additional_info
SC366230
custom_field_two
2
customer
LACSD
datetime
2019-04-26T02:52:33-07:00
documentation
PRO PIPE
is_lateral_inspection
false