Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 6, 2019, 07:57 AM
  • 20 0185_20 0184_03062019_011422.mp4

Date
03/05/2019
W/O
750880
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19109
Time
11:57 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6418
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_750880_TV20060_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
20 0185
Downstream MH
20 0184
Dir. of Survey
Downstream
Length Surveyed
335.9 ft.
Total Length
335.9 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
3
Overall Quick
Overall Rating
330
Pipe schematic from manhole 20 0185 to 20 0184
MH: 20 0185MH: 20 0184downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01850 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start39.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"42.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"91.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"94 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"139.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"142.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"188.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"191.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"237.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"240.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"289.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"333.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish333.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.9 ft. AMH - Downstream Manhole, Survey Ends - 20 0184

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
142.8TFC
139.4TFC
0AMH20 0185
289.8TFC
333.6DAGS
91.2TFC
42.7TFC
237.6TFC
333.6SAP
0MWL
94TFC
240.7TFC
188.7TFC
0MWM
191.8TFC
286.8TFC
2SAP
39.1TFC
2DAGS
335.9AMH20 0184

Properties (6)

additional_info
SC365934
custom_field_two
2
customer
LACSD
datetime
2019-03-05T23:57:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false