Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 5, 2019, 10:50 AM
  • 20 0194_20 0193_03052019_041720.mp4

Date
03/05/2019
W/O
750880
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19118
Time
2:50 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6417
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_750880_TV20060_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0194
Downstream MH
20 0193
Dir. of Survey
Downstream
Length Surveyed
457.5 ft.
Total Length
457.5 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
455
O&M Index
2
O&M Quick
312Q
O&M Rating
185
Overall Index
2
Overall Quick
Overall Rating
640
Pipe schematic from manhole 20 0194 to 20 0193
MH: 20 0194MH: 20 0193downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01940 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.2 ft. MGO - General Observation - MAG COATING THROUGHOUT 50%65.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"67.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"165.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"168.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"213 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"217 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"265.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"268.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"314.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"317.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"366 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"369 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"419.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"423.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"455 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish455 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish455 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIES455 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish457.5 ft. AMH - Downstream Manhole, Survey Ends - 20 0193457.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT 50%

    5.2 ft. - General Observation - MAG COATING THROUGHOUT 50%

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIES

    455 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIES

Observations (29)

DistanceCodeObservation
2SAP
2DAGS
67.7TFC
119.4TFC
213TFC
457.5AMH20 0193
268.7TFA
457.5MGOACTIVE CONNECTION AT MH 3 O'CLOCK
369TF
455SSS
217TFA
2SSS
314.1TFC
265.3TFC
0AMH20 0194
165.1TFC
455DAGS
5.2MGOMAG COATING THROUGHOUT 50%
168.5TFC
65.1TF
419.8TFC
366TFC
423.1TFC
317.8TFC
455DSZDEBRIES
0MWM
0MWL
116.4TFC
455SAP

Properties (6)

additional_info
SC365933
custom_field_two
2
customer
LACSD
datetime
2019-03-05T02:50:48-08:00
documentation
PRO PIPE
is_lateral_inspection
false