Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 14, 2019, 07:55 AM
  • 02 0425_02 0433 _02142019_001806.mp4

Date
02/13/2019
W/O
745529
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00312
PipeID
P02748
Time
11:55 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6395
Sewer Name
02 70TH WAY EXTENSION TRUNK
City
PARAMOUNT
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_745529_TV02338_JAN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 0433
Downstream MH
02 0425
Dir. of Survey
Upstream
Length Surveyed
334 ft.
Total Length
334 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
4131
O&M Rating
143
Overall Index
2
Overall Quick
Overall Rating
145
Pipe schematic from manhole 02 0433 to 02 0425
MH: 02 0433MH: 02 0425upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 04252 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish39.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"84.9 ft. DAZ - Deposits Attached Other, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES - MINERALS89.3 ft. CS - Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES119.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"167.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"232.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"239.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"262.4 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 12 o'clock, , within 8 inches of joint: YES - MINERALS325 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Finish325 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start332 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Start334 ft. MWM - Water Mark, 50 %of cross sectional area334 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK334 ft. AMH - Downstream Manhole, Survey Begins - 02 0433334 ft. MWL - Water Level, 40 %of cross sectional area

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 12 to 12 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 09 to 12 o'clock,  , within 8 inches of joint: YES - MINERALS

    71.6 ft. - Deposits Attached Other, 5 %of cross sectional area, from 09 to 12 o'clock, , within 8 inches of joint: YES - MINERALS

  • Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES

    244.7 ft. - Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES

  • Deposits Attached Other, 15 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES - MINERALS

    249.1 ft. - Deposits Attached Other, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES - MINERALS

Observations (17)

DistanceCodeObservation
332DAGS
214.2TFC
101.6TBA
249.1DAZMINERALS
0MWM
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
166.5TFA
244.7CS
9DAGS
94.1TFC
294.7TFA
334AMH02 0425
2DAGS
0AMH02 0433
0MWL
71.6DAZMINERALS
9DAGS

Properties (6)

additional_info
SC365906
custom_field_two
3
customer
LACSD
datetime
2019-02-13T23:55:35-08:00
documentation
PRO PIPE
is_lateral_inspection
false