Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 14, 2019, 06:21 AM
  • 02 0430_02 0429 _02132019_223613.mp4

Date
02/13/2019
W/O
745529
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00312
PipeID
P02753
Time
10:21 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6395
Sewer Name
02 70TH WAY EXTENSION TRUNK
City
PARAMOUNT
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_745529_TV02338_JAN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 0429
Downstream MH
02 0430
Dir. of Survey
Upstream
Length Surveyed
323 ft.
Total Length
323 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
183
O&M Index
2
O&M Quick
412L
O&M Rating
132
Overall Index
3
Overall Quick
Overall Rating
315
Pipe schematic from manhole 02 0429 to 02 0430
MH: 02 0429MH: 02 0430upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 04301.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish5.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"8.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"54.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"103.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"151.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"204.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"250.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"299.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start304.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"304.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES321 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start323 ft. AMH - Downstream Manhole, Survey Begins - 02 0429323 ft. MWM - Water Mark, 60 %of cross sectional area323 ft. MWL - Water Level, 50 %of cross sectional area

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    18.5 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    23.9 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
18.5TFA
18.5FL
2DAGS
171.9TFA
23.9CM
72.3TFC
219.4TFC
268.3TFC
321.5DAGS
314.3TFC
118.6TFC
321.5CM
323AMH02 0430
0AMH02 0429
0MWM
317.9TBA
0MWL

Properties (6)

additional_info
SC3659036
custom_field_two
2
customer
LACSD
datetime
2019-02-13T22:21:49-08:00
documentation
PRO PIPE
is_lateral_inspection
false