Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 21, 2018, 07:54 AM
  • 08 0202_08 0201 _20122018_235456.mp4

Date
12/20/2018
W/O
740635
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00010
PipeID
P00262
Time
11:54 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6254
Sewer Name
08 GRACE STREET TRUNK, SECTS 2&3
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_740635_TV08022_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
08 0202
Downstream MH
08 0201
Dir. of Survey
Downstream
Length Surveyed
278.9 ft.
Total Length
278.9 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
165
O&M Index
2
O&M Quick
2B00
O&M Rating
32
Overall Index
3
Overall Quick
Overall Rating
197
Pipe schematic from manhole 08 0202 to 08 0201
MH: 08 0202MH: 08 0201downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 02020 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area4.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"12.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start76.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES78.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"87 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish137.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"184.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"278.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish278.9 ft. AMH - Downstream Manhole, Survey Ends - 08 0201278.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  5 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    12.3 ft. - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    76.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
87DSZ
0AMH08 0202
5.9TF
4.4CM
278.9CM
0MWL
76.5DAGS
278.9AMH08 0201
137.3TF
78.5TF
278.9MGOCONNECTION AT MH 9 O'CLOCK
0MWM
184.2TFA
12.3DSZ

Properties (6)

additional_info
SC365487
custom_field_two
3
customer
LACSD
datetime
2018-12-20T23:54:49-08:00
documentation
PROPIPE
is_lateral_inspection
false