Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 30, 2019, 04:16 PM
  • 30 0228_30 0227_5302019_092905.mp4

Date
05/30/2019
W/O
0771073
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00884
PipeID
P17929
Time
9:16 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7990
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES ESTATES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20190529DF_VIA_CAMPESINA_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
30 0227
Downstream MH
30 0228
Dir. of Survey
Upstream
Length Surveyed
84 ft.
Total Length
84 ft.
Structural Index
2
Structural Quick
3121
Structural Rating
6
O&M Index
3
O&M Quick
4221
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 30 0227 to 30 0228
MH: 30 0227MH: 30 0228upstream0 ft. MGO - General Observation - Grease Throughout The Reach (5%)0 ft. AMH - Upstream Manhole, Survey Ends - 9:50 AM0.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish34.2 ft. CC - Crack Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES35.5 ft. IR - Infiltration Runner, at 03 o'clock, within 8 inches of joint: YES36.7 ft. IR - Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES76.5 ft. TBC - Tap Break-In Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"82 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start84 ft. MWM - Water Mark, 20 %of cross sectional area84 ft. AMH - Downstream Manhole, Survey Begins - 9:17 AM84 ft. MGO - General Observation - Conn. @ Mh, 1 O' Clock. Active84 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start84 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    0 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES

    47.3 ft. - Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES

  • Infiltration Runner, at 03 o'clock, within 8 inches of joint: YES

    48.5 ft. - Infiltration Runner, at 03 o'clock, within 8 inches of joint: YES

  • Crack Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES

    49.8 ft. - Crack Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
0MWM
83.4CM
84MGOGrease Throughout The Reach (5%)
84AMH9:50 AM
0AMH9:17 AM
0MGOConn. @ Mh, 1 O' Clock. Active
0CM
0MWL
47.3IR
49.8CC
48.5IR
83.4SSS
7.5TBC
2SSS

Properties (7)

additional_info
THE PIPE ID IS WRONG ONSCREEN. CORRECT PIPE ID IS 017929
custom_field_three
INFILTRATION RUNNERS @ 3 AND 9 O'CLOCK
custom_field_two
3
customer
LACSD
datetime
2019-05-30T09:16:32-07:00
documentation
FRANKLIN, BRAR, CASTILLO
is_lateral_inspection
false