30 0246_30 0245_5172019_030815.mp4
2 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 10% PIPE MATERIAL LOSS
2 ft. - Material Change, Cast Iron - START
13.3 ft. - Surface Corrosion Metal Pipe, from 05 to 07 o'clock, within 8 inches of joint: YES - CHIPPED AREA
21.1 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SWOLLEN RUSTED PIPE
31.5 ft. - General Observation - COATING AREA
48.5 ft. - General Observation - COATING AREA
52.6 ft. - General Photograph - COATING
59.4 ft. - General Observation - COATING ON PIPE
67.7 ft. - General Photograph - PIPE COATING
86.5 ft. - General Observation - PIPE COATING
102.8 ft. - General Observation - PIPE COATING
121.4 ft. - General Observation - PIPE COATING
139.5 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
139.5 ft. - General Observation - NRCP START
139.5 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
139.9 ft. - General Observation - CHIP AT JOINT 2:00
| Distance | Code | Observation |
|---|---|---|
| 67.7 | MGP | PIPE COATING |
| 86.5 | MGO | PIPE COATING |
| 59.4 | MGO | COATING ON PIPE |
| 158.2 | SAM | SEVERE AGG MISSING |
| 2 | SCP | 10% PIPE MATERIAL LOSS |
| 13.3 | SCP | CHIPPED AREA |
| 0 | MWM | — |
| 139.9 | MGO | CHIP AT JOINT 2:00 |
| 48.5 | MGO | COATING AREA |
| 139.5 | SCP | 10% MATERIAL LOSS |
| 121.4 | MGO | PIPE COATING |
| 21.1 | SCP | SWOLLEN RUSTED PIPE |
| 0 | AMH | 3:05AM |
| 31.5 | MGO | COATING AREA |
| 158.2 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 139.5 | SAM | SEVERE AGG |
| 0 | MWL | — |
| 139.5 | MGO | NRCP START |
| 139.5 | MMC | FINISH |
| 139.5 | SAM | SEVERE AGG |
| 102.8 | MGO | PIPE COATING |
| 2 | MMC | START |
| 139.5 | SCP | SWOLLEN RUST |
| 158.8 | AMH | 3:45AM |
| 52.6 | MGP | COATING |