Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 7, 2019, 09:45 AM
  • F 0242_F JOINT _02072019_021050.mpg

Date
02/07/2019
W/O
740025
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00039
PipeID
P20475
Time
1:45 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6268
Sewer Name
F JOINT OUTFALL F - UNIT 4
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
WO_740025_TV02314_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
F 0242
Downstream MH
F JOINT
Dir. of Survey
Downstream
Length Surveyed
1.9 ft.
Total Length
1.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
5231
O&M Rating
13
Overall Index
4
Overall Quick
Overall Rating
13
Pipe schematic from manhole F 0242 to F JOINT
MH: F 0242MH: F JOINTdownstream0 ft. MWM - Water Mark, 100 %of cross sectional area0 ft. MWL - Water Level, 100 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 02421.9 ft. DAGS - Deposits Attached Grease, 50 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES1.9 ft. MSA - Survey Abandoned - DUE TO HEAVY GREASE IN LINE1.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - UNKOWN DEBRIS

Observation photos (2)

  • Survey Abandoned - DUE TO HEAVY GREASE IN LINE

    1.9 ft. - Survey Abandoned - DUE TO HEAVY GREASE IN LINE

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES - UNKOWN DEBRIS

    1.9 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - UNKOWN DEBRIS

Observations (6)

DistanceCodeObservation
1.9DAGS
1.9MSADUE TO HEAVY GREASE IN LINE
0MWM
0MWL
0AMHF 0242
1.9DSZUNKOWN DEBRIS

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-02-07T01:45:17-08:00
documentation
PROPIPE
is_lateral_inspection
false