Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2018, 10:35 AM
  • 32 0141_32 0140 _07262018_033533.mp4

Date
07/26/2018
W/O
718360
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P19889
Time
3:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5881
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_718360_TV32015_AUG2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 0141
Downstream MH
32 0140
Dir. of Survey
Downstream
Length Surveyed
415.4 ft.
Total Length
415.4 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
246
O&M Index
2
O&M Quick
2O00
O&M Rating
164
Overall Index
3
Overall Quick
Overall Rating
410
Pipe schematic from manhole 32 0141 to 32 0140
MH: 32 0141MH: 32 0140downstream0 ft. MGO - General Observation - MAG COATING THROUGHOUT 75%0 ft. AMH - Upstream Manhole, Survey Begins - 32 01410 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start413.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish413.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish415.4 ft. AMH - Downstream Manhole, Survey Ends - 32 0140

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MGOMAG COATING THROUGHOUT 75%
2DAGS
413.8DAGS
415.4AMH32 0140
0AMH32 0141
0MWM
0MWL
2SAP
413.8SAP

Properties (6)

additional_info
SC359749
custom_field_two
2
customer
LACSD
datetime
2018-07-26T03:35:19-07:00
documentation
PRO PIPE
is_lateral_inspection
false